I finally set up my garage as a spray paint booth until my new paint booth arrives from Micro-Mark. The window fan has a furnace filter to protect the fan and the wires with clips on the left are to allow the painted objects to hang and dry. the two freshly painted walkways are hanging after being painted.
Category Archives: Layout Construction
1st walkway color
My first coat of paint on the bridge walkways was the wrong version of Rust-oleum Metallic and had a lot of sparkle. I have communicated with Edmund who sent me his walkway photos on the MR community pages and obtained the correct color that he used and will be posting it as soon as I finish the paint job.
Working on the bridge
I have my spike hammer in hand and I am working on laying rail; just as soon as this next train crosses the bridge.
New NP 4-8-4 Northern engine
I just received my new Broadway Limited Paragon 3, Northern Pacific 4-8-4 Northern steam engine that I ordered last October. I have coded the engine into my JMRI program on my layout PC and turned off the smoke setting. I hope to take the engine to the WMR Club on Thursday and run it in the operation session. I ran it around my layout and it does not like my tight curves.
Bridge weathering
My first attempt at weathering the bridge piers and structure.