I have now added the gravel and glue into the Naches river flowing under the Pacific Cascade bridge and am one step closer to adding track. After allowing the gravel to dry I will be adding some drift wood and grass on the sand bars and maybe a hobo camp.
One step closer to a bridge
Leave a reply